Road Fully Reopened - Darwen Road Railway Bridge
|
||
|
|
||
|
||
|
Road Fully Reopened - Darwen Road Railway Bridge |
||
|
Good News! Darwen Road / Turton Road is now fully re-opened following the earlier bridge strike and the damaged vehicle has been recovered.
Residual congestion should now be clearing. Did you know? Between 1 April 2025 to 31 March 2026 there were 1,706 reported bridge strikes. The number of bridge strikes peaks in October, rising to almost 10 per day. Most bridge strikes happen between 10am and 11am, but numbers remain high until around 6pm.
Bridge strikes are a costly problem for the railway and can cause delays to train services and on the road network while the infrastructure is inspected, repaired and vehicles cleared up.
Most of the vehicles that hit railway bridges are Heavy Goods Vehicles (HGVs) and buses, at a cost of around £13,000 per strike –costing the UK taxpayer around £23m in a year. View good practice guides on how drivers, transport staff and bridge owners can prevent vehicles from hitting bridges and what to do if a bridge strike happens at the following link --> How to prevent vehicles from hitting bridges - GOV.UK
| ||
Reply to this message | ||
|
|




